Welcome to Jiangsu Yuantong Electric Co., Ltd.

Mon–Sat 08:00–20:00 (Beijing Time)

Transformer Factory & Testing in Hai'an, China

OUR FACTORY

See Where Your Transformers Are Built

Jiangsu Yuantong Electric builds every transformer in its own factories in Hai’an, Jiangsu: a 10,530 m² plant running since 2008 and a 53,000 m² intelligent factory completed in 2025. Core cutting, winding, casting, assembly and testing all take place on site.
Aerial view of the Jiangsu Yuantong Electric transformer factory in Hai'an, Jiangsu
Hai'an factory site
Automatic core stacking line in the Yuantong intelligent factory
Core stacking
Coil winding line in the Yuantong factory
Coil winding
Vacuum epoxy casting equipment for dry-type transformer coils
Vacuum casting
Finished transformers in the Yuantong factory hall
Finished products

63,530 m²

Factory area, 2 sites

4,602

Units built in 2025

300+

Employees

220 kV

Test workshop

1991

Manufacturing since

INSIDE OUR WORKSHOPS

Explore Our Workshops

MAJOR EQUIPMENT

Major Production Equipment

The equipment list buyers ask for in a supplier audit.
EquipmentProcessQtyProduct line
Silicon steel cutting line at the Yuantong transformer factorySilicon steel cut-to-length lineCore lamination cuttingOn requestAll transformers
Automatic core stacking line in the Yuantong intelligent factoryAutomatic core stacking machineCore stackingOn requestAll transformers
Coil winding line in the Yuantong factoryFoil and wire winding machinesHV and LV coil windingOn requestAll transformers
Vacuum epoxy casting equipment for dry-type transformer coilsVacuum epoxy casting tankCoil castingOn requestDry-type
Curing and vacuum drying ovensCoil curing, active-part dryingOn requestDry-type, oil-immersed
Sheet metal fabrication lineTank and enclosure fabricationOn requestOil-immersed, box-type, switchgear
Intelligent warehouseMaterial and product storage1All
CAPACITY

Annual Capacity and 2025 Output

Dry-type transformers
3,078 built · 3,960 capacity 78%
Oil-immersed transformers
639 built · 2,250 capacity 28%
Box-type substations
103 built · 285 capacity 36%

Switchgear
782 units built in 2025 · capacity on request

Figures for our original factory. The new 53,000 m² factory adds oil-immersed and box-type capacity from 2026.
Total 4,602 units
MATERIALS

Key Materials and Components

Core

Cold-rolled grain-oriented silicon steel; amorphous alloy for SBH15 units.

Windings

Copper foil and copper wire conductors.

Insulation

Epoxy resin casting system for dry-type coils; transformer oil for oil-immersed units.

Components

Tap changers, bushings and protection devices selected to your specification.

TEST HALL

Test Equipment in Our 220 kV Workshop

Every transformer is tested in our in-house 220 kV test workshop before release. Routine test items and certificates are listed on the Technology & Certifications page.
Transformer testing in the Yuantong 220 kV test workshop

Impulse Voltage Generator

Lightning impulse tests.

Partial Discharge Measurement

Insulation quality checks.

Loss Measurement System

No-load and load loss measurement.

Power Frequency Withstand Test Set

Applied voltage tests.

EXPORT PACKING

Packed for Long-Distance Sea Freight

Distribution transformer loaded into a shipping container for export to Kenya
Finished transformers in the Yuantong factory hall

Export Wooden Case or Transport Base

Each unit is secured against movement and moisture.

Containerized Sea Freight

Units are loaded and lashed at our factory and shipped from Shanghai port.

Trade Terms

FOB, CFR, CIF or EXW. Payment by T/T, L/C or D/A.

Shipping Documents

Packing list, test reports and certificate of conformity with every order.

We have shipped 1,500 units to Kenya and 330 units to Russia; see Projects & Export Markets.
LOCATION

Close to Shanghai and the Ports

Hai'an, Jiangsu, China

Our factory is at No. 68 Xiyuan Avenue, Hai’an Industrial Park, Hai’an, Jiangsu, China, in the Yangtze River Delta north of Shanghai. We can arrange pick-up from Shanghai or Nantong for factory visits.
FAQ

Factory Questions from Buyers

Do you manufacture in your own factory?

Yes. Cores, coils, tanks and final assembly are produced in our own factories in Hai’an, Jiangsu, China, and every unit is tested in our in-house 220 kV test workshop before shipment.

We accept orders from one unit, so you can test a sample before placing a project order.

Typical lead time is 15 working days to one month, depending on the specification and quantity.

Yes. Our original factory alone can produce 3,960 dry-type transformers, 2,250 oil-immersed transformers and 285 box-type substations per year, and our 53,000 m² intelligent factory adds capacity from 2026. We have supplied 1,500 distribution transformers to Kenya in one export programme.

Yes. Voltage, capacity, vector group, cooling, accessories and nameplate can all be built to your specification, to IEC or GB standards or the standard named in your tender.

Customers are welcome to visit our factory in Hai’an, Jiangsu. Contact us to arrange a visit, a live video tour or a pre-shipment inspection.

VERIFY US

Three Ways to Check Our Factory

On-Site Visit

Visit our Hai'an factory and meet our engineers.

Live Video Tour

Walk through our workshops on a video call at a time that suits your team.

Third-Party Inspection

Appoint your own inspector or a third-party agency for pre-shipment inspection.

Company Brochure

Factory, products and reference projects · English